History
The Bowes Railway Path follows a colliery railway built to take coal from north-west Durham to ships on the Tyne. It was proposed by Lord Ravensworth and partners, the coal owners known as the Grand Allies, to link their Mount Moor pit and the new Springwell colliery, sunk from 1821, with staithes at Jarrow. George Stephenson designed the line, with three rope-worked inclines and a locomotive section, and his brother Robert oversaw its building; it opened on 17 January 1826. It was extended to Kibblesworth in 1842, Marley Hill in 1853 and Dipton in 1855, making 15 miles, and under Charles Palmer of John Bowes and Partners it became the Pontop and Jarrow Railway. Renamed the Bowes Railway in 1932, it passed to the National Coal Board in 1947. The line beyond Kibblesworth closed in 1969, and when Kibblesworth colliery shut on 4 October 1974 the railway closed, the last rope-hauled standard-gauge system of its kind in Britain; the stretch from Springwell Bankfoot to Jarrow carried coal to a washery until 10 January 1986.
After closure Tyne and Wear County Council saved the mile and a half between Black Fell and Springwell, with the Springwell workshops, and that part of the line is now a scheduled monument and a working museum run by volunteers. The Bowes Railway Path follows the old line across the Great North Forest, from the Tanfield Railway Path in the west to Jarrow in the east. Beside the path near Kibblesworth stands 'West Wind', 20 pairs of concrete-filled steel beams by Laurent Reynes, commissioned by Gateshead Council for the 1996 Year of Visual Arts.
Facts
- Code
- NE 1115
- Distance
- 10.9 miles (17.5 km). We measure 8.9 miles along the mapped line
- Publisher’s page
- web.archive.org
- Type
- Linear
- Walking time
- About 4 hours
- Difficulty
- Moderate (how we grade)
- Region
- North East
- County
- Tyne & Wear
- Total ascent
- About 283 m. Highest point 174 m


