History
The Silkstone Waggonway was a horse-drawn railway built by the Barnsley Canal Company to bring coal from the pits around Silkstone down the valley of Silkstone Beck to Barnby Basin, the southern end of the Barnsley Canal. A waggonway was authorised by an Act of Parliament in 1808, and construction began in January 1809; by December that year the line from Barnby Basin to Silkstone High Street was almost complete. Its northern section reused the course of the Low Moor Iron Company's waggonway of 1802. Cast iron rails were laid on stone sleeper blocks, and branch lines from around twenty collieries fed into the main line. From 1830 Robert Couldwell Clarke extended it from Silkstone Cross over Silkstone Common to Huskar Colliery, with a steam-worked incline, a self-acting incline and the Black Horse Tunnel under the turnpike road.
The Silkstone Coal Branch Railway took the waggonway's trade from the early 1850s. By 1864 the line belonged to the Aire and Calder Navigation, no coal was carried on it in 1870, and in August 1872 it was reported that the rails had been pulled up and sold. Much of the course became public footpaths and tracks, and hundreds of the stone sleeper blocks can still be seen along it. The route survives as a trail, with interpretation panels and waymarkers, largely through the work of local volunteers, in particular the Roggins Local History Group, who have reinstated sections of rail at a passing place near Pot House Hamlet and helped create a full-size replica coal waggon at Silkstone Cross. In 2011 and 2012 the York Archaeological Trust surveyed the whole route with the group's members, recording 951 features.
Sources for this history
Facts
- Code
- YH 1055
- Distance
- 3.3 miles (5.3 km)
- Publisher’s page
- visitpenistone.co.uk
- Type
- Linear
- Walking time
- About 1 hour
- Difficulty
- Easy (how we grade)
- Region
- Yorkshire and the Humber
- County
- South Yorkshire
- Total ascent
- About 6 m. Highest point 170 m


