Adventure On FootSearch
YH 154

Cinder Track

Linear. Scarborough to Whitby. Published by North Yorkshire Council.

Directions go to Scarborough, where its publisher says it starts. There are no sections to tick until the line is drawn.

Map not drawn yet. OpenStreetMap doesn’t have this route yet, so there’s no map or sections to tick. The facts and sources below are the publisher’s. See the whole route on the publisher’s map.

History

The Cinder Track follows the trackbed of the Scarborough and Whitby Railway, which opened on 16 July 1885 with stations at Scalby, Cloughton, Hayburn Wyke, Ravenscar, Robin Hood's Bay and Hawsker and crossed the River Esk at Whitby on the 13-arch Larpool Viaduct. Steep gradients, sea mists and junctions at both ends where trains had to reverse made the line hard to work, and it was listed for closure in the Beeching Report of 1963. Despite a public campaign it closed to all traffic on 8 March 1965. Most of the rails were lifted in 1968, but talk of a potash mine near Hawsker kept the Hawsker to Whitby section in place until 1972.

Scarborough Borough Council bought the line after closure, and it became a permissive right of way of about 21 miles for walkers, cyclists and horse riders, named the Cinder Track; it now forms part of National Cycle Route 1. The path was neglected for years. In 2018 the council backed a restoration plan costing £3.5 million, drawn up after a survey in which more than three-quarters of users said the surface and drainage needed improving. Work led by the council with the North York Moors National Park Authority, the British Horse Society, Whitby Naturalists' Club and Sustrans began in 2019; two Friends of the Cinder Track volunteer groups were formed, at Whitby and Staintondale, and more than 1,000 trees were planted.

North Yorkshire Council, which has since replaced the borough council, now looks after the track. With Sustrans and a £700,000 grant from the Department for Transport, it resurfaced the stretch between Burniston and Cloughton, widening the path and removing barriers. In 2026 work began on a £2.2 million scheme, paid for through the government's Towns Deal, to improve the track's gateways between Scalby and Scarborough.

Facts

Code
YH 154
Distance
The publisher doesn’t give one
Published by
North Yorkshire Council
Type
Linear
Looked after by
North Yorkshire Council
Region
Yorkshire and the Humber
Total ascent
Can’t be measured until there is a line

Walks nearby

Sources

Checked against northyorks.gov.uk on 2 October 2026.

Something wrong or missing?

Tell us what to change about this route: a wrong length or end, a better source, a route that has been drawn in OpenStreetMap.