Section 8 of 10, Jubilee Greenway
Tower Bridge to Westminster Bridge
2.4 miles (3.9 km). About 1 hour, easy.
Start: TQ 336 801. Finish: TQ 305 796. OS grid.
Take it with you: download this section's GPX file (it opens in OS Maps, Komoot, Outdooractive or a GPS unit) or open the start in OS Maps.
Up and down
About 58 m of climbing and 60 m of descent; highest point 11 m.
Getting there
The section starts at Tower Bridge.
- Stations
- London Bridge, 640 m from the start. Directions TQ 329 801London Fenchurch Street, 790 m from the start. Directions TQ 335 809
- Bus stops
- Tower Bridge, 80 m from the start. Directions TQ 335 800Tower Bridge, 130 m from the start. Directions TQ 335 800City Hall, 200 m from the start. Directions TQ 335 799
- Car parks
- Butlers Wharf car park (pay), 250 m from the start. Directions TQ 337 799Car park (pay), 340 m from the start. Directions TQ 338 803Car park, 340 m from the start. Directions TQ 336 797
Getting back
The section finishes at Westminster Bridge. Stations and bus stops near the finish:
- Stations
- London Waterloo, 530 m from the finish. Directions TQ 310 799Charing Cross, 770 m from the finish. Directions TQ 303 803Waterloo East, 880 m from the finish. Directions TQ 313 800
- Bus stops
- London Eye, 30 m from the finish. Directions TQ 306 796St Thomas' Hospital / County Hall, 40 m from the finish. Directions TQ 306 796London Eye, 130 m from the finish. Directions TQ 307 796
Planning the Jubilee Greenway
- Planning the whole trail: tfl.gov.uk.
What to expect
Underfoot: paved or flagged 100%.
Almost all off road.
No stiles recorded.
No steep climbs: no kilometre gains more than about 13 m.
From OpenStreetMap, where mappers have recorded it: check before you go.
Walked it? Log it
Something wrong or missing?
Tell us what to change about this section: a wrong distance, a moved start, a path that's closed.